Namų Statyba

Namstatyba.lt · Roofing Work in Vilnius

Roofing in Vilnius – from replacing an old roof to installing a new one

We provide pitched and flat roof installation, renovation, flashing, rainwater drainage system installation and old roof covering replacement in Vilnius, Vilnius district, Trakai and the surrounding area.

✓Clear estimate before work begins – no vague “starting from some amount” promises.
✓Work with a warranty and photographic records of each stage.
✓Pitched, flat, metal and bituminous roofs.
✓Materials + installation or labour only, based on your project.
20+years of construction experience
287+completed projects
5 yearsworkmanship warranty
48 hindicative estimate
Roofing in Vilnius – an actual Namstatyba.lt roofing project
An actual roofing project Pitched roof work, finishing details and roof covering installation in Vilnius and Vilnius district.
Nailing bituminous roof covering onto a pitched roof with a pneumatic nail gun
Fastening bituminous roof covering A practical demonstration of nailing the covering onto a pitched roof deck with a pneumatic nail gun.
Roof costs and replacement at a glance

How much does it cost, and when is it worth replacing a roof?

The cost of roofing work depends not only on the covering, but also on the condition of the structure, pitch, height, flashing, rainwater system and removal of the old roof.

€

Roofing cost

In 2026, roofing in Vilnius usually starts at 16–25 €/m² for simpler roofing work, while a more comprehensive pitched roof installation can reach 25–45 €/m² or more.

↻

Old roof replacement

The cost of replacing an old roof depends on removing the covering, the condition of the timber structure, battens, breathable membrane, flashing and rainwater drainage system.

⌂

Pitched and flat roofs

We work with metal sheets, roof tiles, bituminous coverings, asbestos-free fibre cement sheets, torch-on membranes, PVC membranes, parapets and roof details.

All roofing work in one place

Roofing services in Vilnius

We can carry out a complete roof installation or individual tasks – from installing the covering to flashing, soffits and the rainwater system.

01

New roof installation

Roof structure, breathable membrane, battens, covering, ridges, bargeboards, rainwater system and roof finishing details.

02

Old roof replacement

Removal of the old covering, structural inspection, replacement of rotten components, installation of the new covering and flashing.

03

Flat roof installation

Torch-on bituminous membrane, PVC membrane, roof drains, parapets, roof insulation and warm flat roof repair.

04

Flashing

Metal flashing for chimneys, parapets, ridges, bargeboards, drip edges, window sills and other roof details.

05

Rainwater drainage systems

Gutters, downpipes, brackets, roof drains, roof water drainage and integration with the site's drainage solutions.

06

Roof repairs

Local leaks, damaged areas of roof covering, flashing defects, chimney areas, soffits and roof window details.

Indicative 2026 prices

Roofing prices in Vilnius

Prices are provided as a guide. An exact estimate is prepared based on the roof area, pitch, height, covering, structural condition and additional details.

Roofing work price table

The table helps you understand a realistic budget. The cheapest line item online often refers to just one task, excluding removal, flashing, soffits, the rainwater system and more complex details.

excluding VAT / indicative
WorkPrice fromUnit of measurementWhen applicable
Metal roofing installation16–25 €m²For simpler pitched roofs with a prepared structure.
Pitched roof installation with a more complete build-up25–45 €m²Membrane, battens, covering, ridges, bargeboards and details.
Removal of old roof covering5–12 €m²Depends on the covering type, height, waste and access.
Fibre cement roof replacement25–55 €m²Including removal of the old fibre cement sheets, preparation and installation of the new covering.
Bituminous shingle installation12–25 €m²For roofs with an OSB deck and a suitable pitch.
Torch-on membrane for flat roofs12–30 €m²For garages, extensions, commercial roofs and warm flat roofs.
Roof insulation14–35 €m²Mineral wool, PIR, EPS or other solutions depending on the roof structure.
Rainwater drainage system installation8–18 €mGutters, downpipes, brackets and connections.
Roof soffit installation13–25 €mTimber, plastic or metal soffits.
Roof window installation150–350 €unitDepends on the roof covering, height and finishing around the window.
Note: the final cost of roofing work usually becomes clear after an inspection or project review. If the roof structure is damaged, additional work on rafters, battens, membranes, insulation or flashing is required.
Old roof replacement in Vilnius – removal of roof covering and installation of new covering
Old roof replacement Before calculating the cost, both the covering and the timber structure must be assessed.
One of the most common enquiries

Old roof replacement cost – what affects it most?

Replacing an old roof is not just a matter of fitting a new covering. The greatest risks arise when rotten battens, damaged rafters, poor ventilation or defective chimney details are found beneath the old covering.

  • ✓Removal of the old covering: fibre cement sheets, metal sheets, tiles and bituminous coverings differ in removal cost and the amount of waste.
  • ✓Structural inspection: we assess rafters, battens, membranes, chimney areas and roof ventilation.
  • ✓Choosing a new covering: metal sheets are usually more economical, tiles are heavier, and bituminous shingles require a deck.
  • ✓Finishing work: flashing, soffits, rainwater drainage and roof safety components often account for a significant share of the budget.
Roof coverings and solutions

What type of roof can we install?

Each covering has its own cost, installation requirements and weak points. That is why an estimate should account for the entire roofing system, not just the covering.

Metal roofing installation

Metal roofing is one of the most popular choices for detached houses in Vilnius because of its cost, weight, quicker installation and wide choice of colours. Correct batten installation, a ventilation gap, and ridge and bargeboard details are essential.

standing seam metal roofing trapezoidal metal roofing modular metal roofing ridges and bargeboards gutters and downpipes

Flat roof installation

For flat and warm flat roofs, the most important factors are slopes, roof drains, parapets, waterproofing and proper water drainage. We work with torch-on bituminous membranes, PVC membranes and insulation solutions.

torch-on membrane PVC roof membrane parapets roof drains garage roofing

Fibre cement roof replacement

When replacing old fibre cement sheets, it is important to remove the covering safely, assess the timber structure and address roof ventilation straight away. The new covering can be metal sheets, asbestos-free fibre cement sheets, tiles or another solution suited to the roof structure.

removal of old covering asbestos-free fibre cement sheets structural inspection waste removal

Tiled and bituminous roofs

Roof tiles have a substantial appearance but require a stronger structure. Bituminous shingles suit more complex roof shapes, but they need a high-quality deck. With these roofs, it is especially important to pay close attention to the details.

Bituminous covering on a pitched roof is installed on a prepared deck, and the quality of fastening directly determines whether the covering stays watertight and secure through wind, rain and temperature changes.

concrete roof tiles clay roof tiles bituminous shingles OSB deck pneumatic fastening
Nailing bituminous roof covering onto a pitched roof with a pneumatic nail gun
Clear work process

How does roofing work proceed?

An orderly process reduces the risk of disputes. That is why we agree on the scope, price, materials, deadlines and responsibilities before work begins.

Inspection or project

We assess the roof area, pitch, height, covering, structure and access.

Estimate

We provide a clear breakdown of labour and materials so you can see the realistic budget.

Materials

We select the covering, membranes, formed metal flashings, rainwater system and other details.

Start of work

We organise removal, preparation, installation, flashing and site cleanup.

Covering installation

We install the covering according to the manufacturer's requirements and the details of the specific roof.

Flashing

We complete the ridges, bargeboards, chimneys, parapets, drip edges and other critical details.

Rainwater system

We install gutters and downpipes and arrange water drainage from the roof.

Handover

We check the completed work, document the stages and provide recommendations for use and maintenance.

Why not just “cheap roofers”

A company or individual tradespeople?

The roof is one of the most expensive parts of a house, where mistakes often only become apparent after rain, frost or several seasons.

Low-cost ads

lowest initial price

Often, only a single work item is advertised, without assessing the entire roofing system.

  • Unclear what is included in the price
  • Often no written commitment to responsibility
  • Additional work emerges along the way

Namstatyba.lt

clear estimate and responsibility

We account for not just the covering, but the entire roof installation approach, from the structure to the rainwater system.

  • Scope of work before starting
  • Stage documentation
  • Warranty and clear communication

What matters most?

not just €/m²

The most important thing in a roofing estimate is seeing the full scope: removal, membrane, battens, covering, flashing and rainwater system.

  • Clear quantities
  • Clearly specified materials
  • Clear responsibility for details
Important before work begins

Do you need a permit to replace a roof?

Simply replacing a roof covering is often considered a minor repair, but the situation changes if the building's appearance, structure, roof shape or height is altered, or if the property is in a protected / cultural heritage area.

  • ✓If only the covering is being replaced: it is often a simpler repair, but the specific situation still needs to be assessed.
  • ✓If the structure is being altered: it may qualify as a major renovation or reconstruction.
  • ✓If the building is in a protected area: permit and approval requirements must be checked separately.
  • ✓In apartment buildings: issues involving co-owners, the building administrator and the building's status are also important.
!

Check before commissioning work

If you plan not only to replace the covering but also to raise the roof, change its pitch, create an attic living space, install roof windows or alter the building's exterior appearance, it is worth assessing design and permit requirements first.


Namstatyba.lt can help you assess the practical side of the work: what will actually need to be removed, what may increase the estimate and which solutions are worth planning before starting.

Want to know the realistic cost of roofing work?

Send photos of the roof, its approximate area or a project. We will prepare a clear price range and explain what could most affect the final total.

What should you include in your enquiry?

  • ✓Roof type: pitched, flat, garage or outbuilding.
  • ✓Approximate area in m² or house dimensions.
  • ✓Whether you need roofing only or removal of the old roof as well.
  • ✓A few photos from outside and the attic, if available.
FAQ

Frequently asked questions about roofing work

Answers to frequently asked questions about roofing costs, choosing a covering and the work process.

Indicative roofing prices in Vilnius start at 16–25 €/m² for simpler roofing work. A more comprehensive pitched roof installation with membrane, battens, covering and details often costs from 25–45 €/m² or more.
The cost of replacing an old roof depends on removing the covering, structural condition, the amount of waste, the new covering, flashing and the rainwater system. If rafters or battens are damaged, the estimate increases.
Yes. We provide flat and warm flat roof installation and repairs, torch-on membrane installation, PVC membrane solutions, parapet flashing, roof drains and rainwater drainage details.
The most economical solutions are usually metal roofing or asbestos-free fibre cement sheets, but the final cost depends not only on the material, but also on installation complexity, flashing, roof shape and structural condition.
Replacing the roof of a small detached house often takes from a few days to a few weeks. The duration depends on weather conditions, roof area, covering type, removal and additional work.
Yes, we can provide installation only, but first we assess whether the materials are suitable for the specific roof and whether all necessary accessories are available: membranes, formed flashings, ridges, screws and sealing components.
Yes, the work comes with a warranty. Warranty terms depend on the scope of work, the materials used and whether the manufacturer's installation requirements were followed.
EN ▾