Masonry movement joints: why the designer chooses their locations, which drawings are needed and what to check before starting masonry work.

Get an estimate

Describe the work and attach the design, drawings or photos. We will contact you about your enquiry.

The enquiry form is loading. If the form does not appear, call +370 640 28114.

Movement joints in masonry: why must their locations be clarified in the design? – AI illustration
AI-generated illustration, not a photo of a completed project.

Masonry movement joints must be planned according to the specific wall and building design, not just a spacing found online. Before starting masonry work, it is important to know not only where the joint will be, but also how it will be installed, sealed and coordinated with the finishes. If this information is missing from the design, the details must be clarified with the designer rather than left to be decided on site.

The client does not need to calculate joint locations or widths themselves. Their task is to ensure that the designer and contractor use the same up-to-date design details and that the quotation clearly defines the scope of work.

Why are movement joints needed in masonry?

Masonry dimensions can change due to variations in temperature and moisture. Different parts of a building may also deform differently. A movement joint is provided to allow anticipated movements at the location specified in the design, without restricting them through an unsuitable connection.

This is not an ordinary vertical mortar joint between blocks or bricks. The performance of a movement joint depends on the complete design: the gap, filler, sealing, connection details and installation of finishes. Simply leaving a gap does not mean the joint has been installed correctly.

A joint in an individual masonry layer should not be equated with a structural joint separating the entire building. The design specifies which layers and structures the joint must extend through.

Why is wall length alone not enough?

Wall length is important, but it is not the only criterion. The designer may need to assess the wall’s height and thickness, changes in these dimensions, the arrangement of openings, loads, connections between different materials and different temperature conditions.

The “Bauroc” recommendations on wall reinforcement and movement joints emphasise that building configurations differ, so the designer must choose the most suitable joint locations. The movement joints section of the “Fibo” catalogue also states that the specific location is determined by the designer.

A manufacturer’s recommendation is not a universal rule for all masonry systems. Instructions for one block system cannot automatically be applied to another. It is therefore more useful to replace the question “How many metres apart should joints be?” with “Does the design account for the chosen masonry system and the specific wall geometry?”

Joint location and installation detail are different things

A line marked on a plan helps identify the joint location, but does not always explain its installation. Before work begins, it is worth checking the related drawings:

  • Wall plans: can the joint be precisely located relative to grid lines, openings or other clear reference points?
  • Elevations and sections: how does the joint extend through the wall height, and how does it appear in the finishes?
  • Installation detail: what gap, filler, sealing and connection details are specified?
  • Finish details: how is it ensured that the finishes do not restrict the intended joint movement?

Information may be provided in different design drawings. What matters most is that they do not contradict one another. If the plan shows the joint in one location and the elevation in another, the discrepancy must be resolved before the relevant wall is built.

When is clarification from the designer essential?

If joints are not marked in the design

The absence of joints in a drawing does not, in itself, prove either that they are unnecessary or that they have been omitted. Provide the designer with the current wall plan, information about the chosen blocks or bricks, and a specific question: does this wall require a movement joint, and if so, where is it planned and what installation detail should be used?

Ask for the solution to be documented in an updated drawing or another clear design clarification. A verbal agreement is difficult to verify later, especially when different contractors carry out the masonry and finishing work.

If the blocks or wall design have changed

If the masonry system, wall dimensions, opening arrangement or structural connections change, confirm whether the previous joint design is still suitable. A change of materials should not be treated solely as a purchasing matter: the manufacturer’s recommendations and installation details may differ.

If you want to move the joint for the sake of the facade’s appearance

The joint must not be moved without approval to align it with a window edge or a less visible part of the facade. It is worth raising this request with the designer before work begins. They must assess whether the location can be changed and how the change would affect related design details.

If masonry reinforcement is specified

Reinforcement and movement joints are not inherently interchangeable solutions. Reinforcing a wall alone does not justify omitting a joint specified in the design. Their relationship must be assessed according to the chosen masonry system and design.

Checklist before starting masonry work

This checklist is intended for preparation and discussions with the designer and contractor, not for independently selecting structural dimensions.

What to checkWhat answer or document is needed
Joint locationAn up-to-date drawing with a clearly marked location and reference dimensions.
Masonry systemConfirmation of the specified block or brick system and the recommendations applicable to it.
Installation detailA design detail describing the gap, filler, sealing and connection details.
Coordination with finishesA clear design detail showing how the joint is installed at the render or other facade layers.
Design changesClarification from the designer if materials, geometry or connections have changed.
Scope of workA list of what is included in the contractor’s quotation and what will be carried out at another stage.
Inspection before coveringAn agreement on who will inspect the installed joint, when, and against which drawing.

How should you compare contractors’ quotations?

Two quotations listing “installation of movement joints” may cover different work. One may include only forming a gap in the masonry, while another may also include filling and sealing it. The joint in the finishes may belong to a different stage of work.

When comparing quotations, ask for the following to be specified separately:

  • which design drawing and detail the work is priced against;
  • whether forming, filling and sealing the gap are included;
  • who supplies the materials and connection components specified in the design;
  • whether the joint detail in the finishes is included;
  • which work and materials are excluded from the quotation.

It only makes sense to compare prices for the same scope of work. An undefined joint detail makes both pricing and subsequent acceptance of the work more difficult.

What should be recorded before the joint is covered?

Before installing the layers that will cover it, it is worth taking overview and detail photos, marking the location on the drawing and recording the materials used. Photos help preserve information, but do not replace the agreed inspection or design requirements.

If doubts arise on site about the location, filler, connections or continuity of finishes, the unclear detail must be clarified before it is concealed. Cracks should not automatically be attributed to a lack of joints either — a specialist assessment may be needed to determine their causes.

“Namų Statyba” provides masonry services in Vilnius and Vilnius district. When planning work, the design and intended scope of work must be provided for pricing. Clear joint details help define more precisely which tasks need to be included in the quotation.

Research sources

Prepared using AI and research of public sources. General information does not replace an individual design and specialist assessment.

EN ▾

Iš mūsų Facebook

NamStatyba istorijos

Darbų eiga, vaizdo įrašai ir mūsų Facebook įrašai.

Visos istorijos →
Statybų eiga vaizdo įrašeFacebook Reels
Statybų eiga vaizdo įrašeFacebook Reels
Statybų eiga vaizdo įrašeFacebook Reels
Statybų eiga vaizdo įrašeFacebook Reels
Kelio pagrindo įrengimasRugpjūtis 19 d.
Kelio pagrindo įrengimasRugpjūtis 19 d.
1 / 57

Perbraukite arba paspauskite kadrą

Jūsų projekto kaina

Kiek kainuotų
Jūsų projektas?

Pasirinkite darbus ir palikite kontaktą. Aptarsime apimtį ir parengsime individualų pasiūlymą.

Kontaktus naudosime atsakyti į Jūsų užklausą. Privatumo politika.